Pontypridd, South Walesinfo@lewzpropertydevelopment.co.uk

Mon–Sat 7:00 – 18:00Company No. 15585929

About

Services

Service Areas

Our Work

Reviews

Contact

07576 546805Request Estimate

- Home
- Services
- Bathroom Renovations

Bathroom Renovations · Pontypridd &amp; South Wales

# New Bathrooms.Strip-Out To Tiling.Done Once, Done Right.
Full bathroom renovations across Pontypridd, Cardiff and South Wales — design, strip-out, tanking, replumb, screed, tile and fit. One team, one fixed written quote, water staying where it should.

Request Free Estimate  07576 546805

30+ Years Combined Trade Experience · Fixed Written Quotes · Same-Week Surveys

 Full bathroom fit-out

 Tanking systems on every wet area

 Fixed written quotes

 Fully insured — £1m PL · £10m EL

Service Overview

## Bathroom Renovations —The Brief, In Plain English.

### What It Is
A bathroom renovation strips a tired or failing bathroom back to brick or stud and rebuilds it as a properly waterproofed, properly serviced wet room or family bathroom. Strip-out, replumb to current regs, tanking, screed, underfloor heating where wanted, tile, grout, silicone and fit-out.

### Who It&#x27;s For
Homeowners replacing a tired bathroom; landlords turning round rental bathrooms between tenancies; renovators rolling a bathroom into a wider scheme; anyone who&#x27;s been quoted by a bathroom showroom that supplies but doesn&#x27;t fit, or a fitter who doesn&#x27;t tank.

### When You Need It
Once you&#x27;ve settled on the layout and the suite, and the rest of the house programme allows for 7–14 days without a working bathroom — or with the right family logistics, longer.

### Why It Matters
Bathrooms fail at the tanking step. A bathroom fitted by a kitchen fitter, plumber or general handyman skipping the tanking system will leak into the ceiling below inside 12–24 months — and the damage is structural, not cosmetic. The unglamorous bits decide the lifespan.

What Happens If You Wait

## The Cost OfDoing Nothing.
A leaking bathroom is the most expensive failure in domestic construction. Joists rot, ceilings come down, insurance gets argued.

###  Risks Of Ignoring It

- →Wet rooms tiled before tanking — water in the joists, ceiling down below within 18 months.
- →Pipework run in floor voids without access — first leak means a floor up.
- →Tile grout failing because of substrate movement — water gets behind the tiles.
- →Silicone bead applied over dirty surfaces — peels off, water tracks behind.
- →Wrong board behind tiles — paper-faced plasterboard under a shower, not tile-backer.

### Common Mistakes Customers Make

- ×Buying the suite before measuring up properly.
- ×Letting a kitchen fitter &#x27;do the bathroom too&#x27;.
- ×Skipping underfloor heating then regretting it forever.
- ×Specifying glass-only screens where a half-height wall would work better.

Our Process

## First Call ToFinal Sign-Off.

01

### Survey &amp; Spec
Measure up, agree the layout and suite spec, check existing services, photograph everything before strip-out.

02

### Fixed Written Quote
Itemised written quote — strip-out, plumbing, tanking, tile spec, suite, second fix, decoration.

03

### Strip &amp; First Fix
Bathroom stripped to brick or stud, pipework reset to current regs, electrical first fix, tile-backer board where required.

04

### Tank, Screed &amp; Tile
Full tanking system to walls and floor in wet areas, screed to fall, underfloor heating laid, tile and grout to spec.

05

### Fit &amp; Sign-Off
Suite installed, silicone beaded properly, tested under pressure, snags fixed same day, paperwork handed over.

Why It&#x27;s Worth It

## What YouActually Get.

### Tanking Done Properly
Full liquid or membrane tanking system to walls and floor in any wet area — the bit that stops your ceiling coming down next year.

### Water Where It Belongs
Falls cut into the screed, pipework pressure-tested, traps accessible, silicone beaded to clean surfaces. No surprises.

### Tile-Ready Substrate
Tile-backer board behind tiled walls, not paper-faced plasterboard. The substrate decides whether the tiles still look right in five years.

### Underfloor Heating Option
Wet or electric UFH laid under tile when specified — quiet, even warmth and no ugly radiator on the wall.

### One Quote, One Team
Plumber, tiler, electrician and joiner all run on one programme by one accountable team. No three-trade booking dance.

In Detail

## Bathroom Renovations —Every Variation Covered.
Materials, methods and the situations each variation applies to — so you know what you&#x27;re buying before you buy it.

Working across

Pontypridd · Rhondda · Ynysybwl &amp; Abercynon · Talbot Green · Aberdare · Merthyr Tydfil · Caerphilly

 Full Service Area Map 

### Family Bathrooms
Bath plus separate shower or shower-over-bath, vanity unit, WC and storage to a domestic spec built to last the next 10–15 years. Standard suite or your supplied kit.

### Wet Rooms &amp; Walk-In Showers
Fully tanked floor and walls, screed-to-fall, linear or point drainage, frameless glass screens, large-format tiles. The bit that fails most often when done by anyone but a properly trained fitter.

### En-Suites &amp; Cloakrooms
Compact layouts where every millimetre counts — pumped soil systems where gravity won&#x27;t reach, slimline suites, sliding or pivot doors. Same tanking standard as a full bathroom.

### Rental &amp; Landlord Turnarounds
Hardwearing, easy-clean specs designed for tenant turnover — durable tile, simple silicone joints, accessible plumbing for the next leak fix. Fast programme between tenancies.

### Period Property Sensitivity
Bathrooms inside Victorian or Edwardian terraces sometimes need solid-wall detailing — lime-friendly fixings, breathable build-ups where possible, and pipework routes that don&#x27;t notch joists into oblivion.

Questions

## StraightAnswers.
Cost, timeline, guarantees, lifespan, emergency availability — the questions everyone asks, answered before you call.

Ask Yours 

### How much does a new bathroom cost in South Wales?
+Cost depends on suite spec, tile choice, layout changes and any structural work. We give itemised fixed written quotes after a site visit so you can see exactly what each element costs.

### How long does a bathroom take to fit?
+A straightforward replacement bathroom is typically 7–10 working days. A full strip, replumb, tank, tile and fit usually runs 10–14 working days. Wet rooms with screed-to-fall and underfloor heating add a few days.

### Do you supply the bathroom suite or do I?
+Either works. We can spec through trade suppliers we trust or fit suites you&#x27;ve bought yourself — just want to see the spec before pricing labour so we don&#x27;t undersize a soil run.

### Do you tank every bathroom?
+We tank every wet area as standard — full tanking system to walls and floor inside shower enclosures and wet rooms. Family bathrooms with bath-only get the wet zones tanked.

### Can you install underfloor heating?
+Yes — wet or electric, laid under screed before tile. Specify at quote stage so we set the floor build-up correctly.

### Will I be without a bathroom for the whole job?
+Yes — once the strip starts the room is out of action until the end. For households without a second bathroom we&#x27;ll talk through options before quoting.

### Do you take a large deposit?
+No. We work on stage payments against completed milestones, not large up-front deposits. You&#x27;re paying for work done.

### Do you handle electrical certificates for the bathroom?
+Yes — Part P electrical work is signed off and certificated, bundled into the handover paperwork.

Next Step

## Tired Bathroom? Phone For A Brief.
Free site survey within our coverage area, written quote typically within 48 hours, no obligation. 30+ years&#x27; combined trade experience across the team, public liability insured, Pontypridd-based.

Request Free Estimate  07576 546805

 Public Liability Insured Company No. 15585929 30+ Years Combined Experience

Related Services

 Kitchen Renovations Whole-House Refurbishments Plastering

Independent, owner-led local builders with 30+ years&#x27; combined trade experience across the team. Extensions, full renovations and ground-up builds across Pontypridd, Cardiff and the wider South Wales region.

07576 54680507581 312279info@lewzpropertydevelopment.co.ukPontypridd, South Wales

### EXPLORE

- About
- Services
- Service Areas
- Our Work
- Reviews
- Contact

### SERVICES

- Bricklaying
- Bathroom Renovations
- Kitchen Renovations
- Whole-House Refurbishments
- Extensions &amp; New Builds
- Plastering

### SERVICE AREAS

- Builders in Pontypridd
- Builders in Rhondda
- Builders in Ynysybwl &amp; Abercynon
- Builders in Talbot Green
- Builders in Aberdare
- Builders in Merthyr Tydfil
- Builders in Caerphilly
- Builders in Cardiff
- Builders in Newport
- Builders in Bridgend
- Builders in Barry
- Builders in Bristol

© 2026 LEWZ Property Development Ltd. Company No. 15585929. All rights reserved.

Privacy PolicyTerms &amp; ConditionsCookie PolicyMon–Sat 7:00 – 18:00

 Call NowGet Estimate